They seem to have used a very peculiar definition of the businesses they looked at. German bureaucracy is cumbersome but 3,942 hours seems very high. Even France's 500 hours sound like a lot.
> For
this study, relevant productive activities of each sector were
considered, namely:
- Primary (1.0%): raising of swine/pigs in combination with
grain farming;
- Secondary (27.7%): manufacture of metal-forming
machinery and machine tools; and
- Tertiary (71.3%): sale, maintenance, and repair of motor
vehicles.
Opening Procedures
Opening procedures for small-sized companies in Germany
require a weighted average of 3,942 hours. Sectors I and II are
the most demanding at 8,633 hours each, driven almost entirely
by the municipal permits and registration group (7,091 hours),
which in the primary and secondary sectors includes the man-
datory BImSchG §4 full immission control permit. Sector III
(motor vehicle repair) is comparatively lighter at 2,056 hours,
as it is not subject to the §4 full permit requirement, with only
a §15 environmental notification applicable.
They seem to have used a very peculiar definition of the businesses they looked at. German bureaucracy is cumbersome but 3,942 hours seems very high. Even France's 500 hours sound like a lot.
> For this study, relevant productive activities of each sector were considered, namely:
- Primary (1.0%): raising of swine/pigs in combination with grain farming;
- Secondary (27.7%): manufacture of metal-forming machinery and machine tools; and
- Tertiary (71.3%): sale, maintenance, and repair of motor vehicles.
Opening Procedures
Opening procedures for small-sized companies in Germany require a weighted average of 3,942 hours. Sectors I and II are the most demanding at 8,633 hours each, driven almost entirely by the municipal permits and registration group (7,091 hours), which in the primary and secondary sectors includes the man- datory BImSchG §4 full immission control permit. Sector III (motor vehicle repair) is comparatively lighter at 2,056 hours, as it is not subject to the §4 full permit requirement, with only a §15 environmental notification applicable.
Study summary: https://freedom.fiu.edu/wp-content/uploads/2026/09/Index-of-...
Full study: https://freedom.fiu.edu/wp-content/uploads/2026/10/Index-of-...